This system has been manufactured in our factory since 1985 for Günter RUX GmbH company.
The combination of the individual scaffolding fields by using decks mounted on pins on vertical frame makes for speedy installation of the system. Moreover, this way prevents decks from slipping out.
This solution offers a high degree of safety for scaffolders. The folding pins on the vertical frames are used for mounting the rails and diagonals without the use of tools.
Our MJ UNI TOP 65 scaffolding system is available in both steel and aluminium.
The most important advantages of the system:
* Horizontal reinforcement of lock decks using pins.
* Short installation time without the need of additional tools.
* High safety characteristics.
o Decks are firmly locked in the vertical frames.
o The weight and vertical payload are transmitted directly by decks stored in the vertical frame.
o There are no risks of tripping because the decks have no tabs. Vertical frames also have no tabs thanks to "T-profile".
* Automatic holding of horizontals via fixed connection points.
* Quality working area thanks to diagonals mounted on the outside.
* Decks are made of wood, steel, or aluminium